Building day 1st December 2012 (MIP panel assembly) The delivery of the MIP, auto-brake, loudspeaker and landing gear lever has arrived! The two PC setup running the flight deck and simulator. Testing flight for the new panel's and electronics.
Jose Velasco June 29, 2013 at 1:22 am Nice work, I was wondering what korry switches you used for the autobreak panel? i have been looking for something as nice, but have not been able to find much; the panels, I see you bought them already made, where did you get them from? Thanks Jose Reply ↓
Hello, can I ask you something?
Thanks, DF
Nice work, I was wondering what korry switches you used for the autobreak panel? i have been looking for something as nice, but have not been able to find much; the panels, I see you bought them already made, where did you get them from? Thanks
Jose